কনটেন্টটি শেষ হাল-নাগাদ করা হয়েছে: মঙ্গলবার, ১০ মার্চ, ২০২৬ এ ১১:৩৬ AM

সম্পাদিত মৃত্তিকা পরীক্ষণ

কন্টেন্ট: পাতা

Received DateProject Name
2/10/2014CONSTRUCTION OF SOUTH NALUABAGI BRIDGE CUM FLASHING SLUICE OF POLDER NO-54/A, BWDB, PATUAKHALI.
8/8/2014HYDROLOGICAL AND MORPHOLOGICAL STUDY USING MATHAMATICAL MODEL FOR PAGLA-JAGANNATHPUR-RANIGONJ-ASUKANOLI ROAD, SUNAMGONJ.
10/9/2014COASTAL EMBANKMENT PROJECT, BWDB, BHOLA.
26/01/2015RRI SCHOOL BUILDING FOR ADDITIONAL CLASSROOM, FORIDPUR.
26/11/2014UPPER SURMA KUSHIARA PROJECT, SYLHET O&M DIVISION, BWDB, SYLHET.
16/02/2015PENAKHALI BRIDGE TO CHADKATHI EMBANKMENT PROJECT,BWDB,PIROJPUR.
19/08/2013RIGHT BANK OF SURMSA RIVER FCDI PROJECT,BWDB,SYLHET.
9/10/2013RAHIMPUR MAIN IRRIGATION CHANNEL WATER CONTROL STRUCTURE IN JOKIGONJ, BWDB, SYLHET.
20/10/2014RIGHT B ANK OF SURMA RIVER FCDI PROJECT, BWDB, SYLHET.
9/10/2013RIGHT BANK OF SURMA RIVER FCID PROJECT, BWDB, SYLHET.
20/01/2014RIGHT BANK OF SURMA RIVER FCID PROJECT, BWDB, SYLHET.
25/06/2014UPPER SURMA KUSHIARA PROJECT,SYLHET O&M DIVISION, BWDB, SYLHET.
9/10/2013RAHIMPUR MAIN IRRIGATION CHANNEL WARER CONTROL STRUCTURE IN JOKIGONJ, BWDB, SYLHET.
9/10/2013CCTF BISKHALI PROJECT UNDER POLDER NO-05, BWDB, JHALOKATHI.
9/10/2013TWO STORIED DIVISION OFFICE BUILDING AND REST HOUSE AT LAXIPUR BWDB, BWDB, LAXIPUR.
28/04/2014HYLE HAOR PROJECT, BWDB, MOULOVIBAZAR.
13/04/2014FLOOD AND RIVERBANK EROSION RISK MANAGEMENT INVESTMENT PROGRAM BWDB, DHAKA.
11/2/2014CEP (PACKAGE NO-BWDB-FDR COX’S BAZAR W-3A), SUB DIVISION, BWDB, KUTUBDIA, COX’ BAZAR.
25/06/2014BATB, HABIR BARI, PROJECT.
22/05/2014SHAWON CHARA AND BURBURIA CHARA SLUICE GATE CONSTRUCTION PROJECR, BWDB, MOULAVIBAZAR.
12/6/2014BATB PROJECT, SAVAR, DHAKA.
20/08/2013CONSTRUCTION OF EMBANKMENT ON THE BANK OF SHIKALBAHA KHAL FROM KUMAR KHALI KHAL TO VELLA PARA, BWDB, CHITTAGONG.
4/2/2014CLAY BLANKET OF POLDER NO-48(PACKAGE NO-BWDB-FDR/PATUAKHALI WD/W3), BWDB, MOHIPUR, PATUAKHALI.
28/04/20142013-2014 FINANCIAL YEAR CCTF PROJECT, BWDB, PATUAKHALI.
19/01/2014ECRRP POLDER NO- 52/53 ADP FINANCIAL 2013-2014, POLDER NO-55/1, BWDB, PATUAKHALI.
16/01/2014CHANDPUR IRRIGATION, CHANDPUR.
23/04/2014URIR CHAR-NOAKHALI CROSS DAM PROJECT(UCNCP)
20/01/2014GANGES BARRAGE PROJECT, DEVELOPMENT DESIGN CONSULTANTS LTD, DHAKA.
20/01/2014TESTING OF SOIL SAMPLES OF POLDER NO –59/2 FOR THE FISCAL YEAR 2013-2014 BWDB, LUXMIPUR.
11/2/2014HALDA EXTINTION IRRIGATION SUB-PROJECT, BWDB, HATHAZARI, CHITTAGONG.
20/08/2013CONSTRUCTION OF EMBANKMENT ON THE BANK OF SHIKALBAHA KHAL FOR PROTECTION OF SALINE WATET INTRUSION, BWDB, CHITTAGONG.
25/08/2013SHARIFPUR FCDI SUB PROJECT, KULAUARA, BWDB, MOULAVIBAZAR.
24/06/2014CDSP-4 PROJECT, BWDB, NOAKHALI.
18/06/2013POLDER NO-59/3C, BWDB, NOAKHALI.
2/10/2014CONSTRUCTION OF SOUTH NALUABAGI BRIDGE CUM FLASHING SLUICE OF POLDER NO-54/A, BWDB, PATUAKHALI.
8/8/2014HYDROLOGICAL AND MORPHOLOGICAL STUDY USING MATHAMATICAL MODEL FOR PAGLA-JAGANNATHPUR-RANIGONJ-ASUKANOLI ROAD, SUNAMGONJ.
10/9/2014COASTAL EMBANKMENT PROJECT, BWDB, BHOLA.
26/01/2015RRI SCHOOL BUILDING FOR ADDITIONAL CLASSROOM, FORIDPUR.
26/11/2014UPPER SURMA KUSHIARA PROJECT, SYLHET O&M DIVISION, BWDB, SYLHET.
16/02/2015PENAKHALI BRIDGE TO CHADKATHI EMBANKMENT PROJECT,BWDB,PIROJPUR.
19/08/2013RIGHT BANK OF SURMSA RIVER FCDI PROJECT,BWDB,SYLHET.
9/10/2013RAHIMPUR MAIN IRRIGATION CHANNEL WATER CONTROL STRUCTURE IN JOKIGONJ, BWDB, SYLHET.
20/10/2014RIGHT B ANK OF SURMA RIVER FCDI PROJECT, BWDB, SYLHET.
9/10/2013RIGHT BANK OF SURMA RIVER FCID PROJECT, BWDB, SYLHET.
20/01/2014RIGHT BANK OF SURMA RIVER FCID PROJECT, BWDB, SYLHET.
25/06/2014UPPER SURMA KUSHIARA PROJECT,SYLHET O&M DIVISION, BWDB, SYLHET.
9/10/2013RAHIMPUR MAIN IRRIGATION CHANNEL WARER CONTROL STRUCTURE IN JOKIGONJ, BWDB, SYLHET.
9/10/2013CCTF BISKHALI PROJECT UNDER POLDER NO-05, BWDB, JHALOKATHI.
9/10/2013TWO STORIED DIVISION OFFICE BUILDING AND REST HOUSE AT LAXIPUR BWDB, BWDB, LAXIPUR.
28/04/2014HYLE HAOR PROJECT, BWDB, MOULOVIBAZAR.
13/04/2014FLOOD AND RIVERBANK EROSION RISK MANAGEMENT INVESTMENT PROGRAM BWDB, DHAKA.
11/2/2014CEP (PACKAGE NO-BWDB-FDR COX’S BAZAR W-3A), SUB DIVISION, BWDB, KUTUBDIA, COX’ BAZAR.
25/06/2014BATB, HABIR BARI, PROJECT.
22/05/2014SHAWON CHARA AND BURBURIA CHARA SLUICE GATE CONSTRUCTION PROJECR, BWDB, MOULAVIBAZAR.
12/6/2014BATB PROJECT, SAVAR, DHAKA.
20/08/2013CONSTRUCTION OF EMBANKMENT ON THE BANK OF SHIKALBAHA KHAL FROM KUMAR KHALI KHAL TO VELLA PARA, BWDB, CHITTAGONG.
25/08/2013SHARIFPUR FCDI SUB PROJECT, KULAUARA, BWDB, MOULAVIBAZAR.
24/06/2014CDSP-4 PROJECT, BWDB, NOAKHALI.
18/06/2013POLDER NO-59/3C, BWDB, NOAKHALI.
2/3/2015CONSTRUCTION OF DRAINAGE CUM FLUSHING SLUICE, POLDER NO-56/57, PROJECT BWDB,CHARFASSION, BHOLA.
2/3/2015PROPOSED BYPASS REGULATORF BESIDE MANDARTOLA REGULATOR, FARIDPUR O&M DIVISION, BWDB, FARIDPUR.
2/3/2015REGULATOR FOR FLOOD PREVENTION DEVELOPMENT PROJECT OF HAOR AREA, BWDB, SUNAMGONG.
2/3/2015SUB-SOIL TEST FOR OFFICE/COLONY BUILDING AT COMILLA BWDB OFFICE, BWDB, COMMILLA.
15/03/2015CONSTRUCTION OF SLUICE AT GHATAMIA KHAL POLDER NO: 43/2, PATUAKHALI, BWDB.
2/3/2015DIRGH-GHOSKATHI FCDI PROJECT, BWDB.
2/3/2015ECRRP PROJECT, POLDER NO- 41/5, K.M. -24.50,BWDB, BARGUNA.
18/03/2015CONSTRUCTION OF SLUICE AT MATIVANDGA AND MYAIRLCHAR POLDER NO-55/3, WD, KALPARA, PATUDAKHALI.
2/5/2016CONSTRUCTION OF DRAINAGE CUM FLASHING SLUICE AT POLDER NO-47/4,UNDER KALAPARA, PATUAKHALI WD DIVISION,BWDB, PATUAKHALI
2/5/2016TARAIL POCHURIA FLOOD CONTROL, DRAINAGE AND IRRIGATION PROJECT UNDER POLDER NO-3
2/5/2016REGULATOR CONSTRUCTION OF FLOOD CONTROL, BANK PROTECTION AND DRAINAGE FOR BEZA AT MIRERSAI,CHITTAGONG, BWDB, CHITTAGONG.
14/01/2016CONSTRUCTION OF SLUICE AT KM-40.00 UNDER BLUE GOLD PROJECT,BWDB, PATUAKHALI.
14/01/2016CONSTRUCTION OF SLUICE AT KM-30.80 UNDER ECRRP PROJECT, BWDB, PATUAKHALI.
14/02/2016SOIL BORING FOR THE CONSTRUCTION OF DIFFERENT INFRASTRUCTURES UNDER THE PROJECT, “DREDGING” IRRIGATION DEVELOPMENT AND FISHERIY OF GAJNAR BEEL CONNECTED RIVERS UNDER SUJANAGAR UPAZILA OF PABNA DISTRICT,BWDB, PABNA.
27/04/2016SOIL BORING FOR CONSTRUCTION OF DRAINAGE OUTLET AT Km-0.385 NORTH DEANG ON THE FLOOD EMBANKEMENT IN CONNECTION WITH MALIARA–BAKKHAIN–VANDERGAON FCDI PROJECT,BWDB,CHITTAGOBG.
27/04/2016CONSTRUCTION OF REGULATOR UNDER THE PROPOSED SHELTER PROJECT-2 AT KHURUSHKUL AND BIMAN BANDAR, SADAR THANA, COX’S BAZAR DISTRICT.
2/5/2016CONSTRUCION OF SLUICEGATE UNDER REHABILIATION AND DRAINAGE PROJECT NO-64/2A AT PUICHHORI UNION, BASHKHALI, CHITTAGONG BWDB, CHITTAGONG.
2/5/2016CONSTRUCTION OF REGULATOR UNDER THE REHABILATION PROJECT AT MOHESKHALI THANA IN COX’S BAZAR DISTRICT.
18/10/2015CONSTRUCTION OF BRIDGE CUM REGULATOR AT Km-5.45 AT GHOSBARI KHAL OF MANIKGONJ WATER DEVELOPMENT DEVISION ,BWDB, MANIKGONJ.
1/11/2015CONSTRUCTION OF REGULATOR UNDER JHILKA HAOR SUB PROJECT, BWDB, SYLHET.
1/11/2015CONSTRUCTION OF REGULATOR UNDER BORO HAOR SUB PROJECT BWDB, SYLHET.
2/12/2015KUAKATA SEA BEACH PROTECTION AND DEVELOMENT PROJECT, BWDB, PATUAKHALI.
14/01/2016CONSTRUCTION OF REGOLATOR UNDER FCD PROJECT AT HAOR AREA, BWDB, SYLHET.
22/02/2016REGULATOR CONSTRUCTION OF FLOOD CONTROL BANK PROTECTION AND DRAINAGE FOR BEZA AT MIRERSARI, CHITTAGONG BWDB, CHITTAGONG.
25/08/2015CONSTRUCTION SLUICE AT Km-7.780 OF POLDER NO-55/2D UNDER ECRRP, BWDB, PATUAKHALI.
25/08/2015CONSTRUCTION OF SLUICE AT NODMULLA KHAL UNDER UTF PROJECT,BWDB,PIROJPUR.
25/08/2015CONSTRUCTION OF REGIONAL OFFICE BUILDING OF HAOR DEVELOPMENT BOARD.
25/08/2015CONSTRUCTION OF WATER CONTROL STRUETURE AT BRAHMMACHARI KHAL, HABILASH DWIP, PATIYA, CHITTAGONG.
25/08/2015CONSTRUCTION OF SLAICE AT MOSURI KHAL UNDER POLDER NO-43/2B.
25/08/2015CONSTRUCTION OF CROSS REGULATOR AT KILLAPARA MOSQUE(3.110Km) AND BILLAL MOSQUE(6.639Km) OF NORTH SUPPLY CANAL PROJECT,BWDB, CHITTAGONG.
25/08/2015BORNIN BAOR PROJECT, HAOR DEVELOPMENT BOARD, DHAKA.
25/08/2015BORNI BAOR PROJECT, GHONAPARA, GOPALGANJ.
25/08/2015BORNI BAOR PROJECT, TUNGIPARA, GOPALGONG, BWDB , GOPALGONG.
25/08/2015BORNI BAOR PROJECT, TUNGIPARA, GOPALGONG, BWDB, GOPALGONG.
31/08/2015CONSTRUCTION OF SLUICE AT NANDIPARA KHAL UNDER POLDER NO-43/2A, PATUAKHALI.
18/10/2015CONSTRUCTION OF CLIRECTOR GENERAL’S BANGLO AT BANANI BWDB, OFFICERS QUARTER.
18/10/2015SOIL BORING FOR THE CONSTRUCTION OF OFFICE BUILDING AT BERA O&M DIVISSION, BERA, PABNA.
18/10/2015CONSTRUCTION OF REST HOUSE AT MANIKGONJ WATET DEVELOPMENT DIVISSION COLONY, WD DIVISSION, BWDB, MANIKGONJ.
29/03/2015PAYRA PORT CHANNEL FEASIBILITY STUDY, PATUAKHALI.
26/04/2015COLLABORATIVE APPLIED RESEARCH ON “ROLE OF THE TEXTURE (FINES SAND AND CLAY) OF SEDIMENT DISPERSAL PROCESSES IN THE DELTA.

এক্সেসিবিলিটি

স্ক্রিন রিডার ডাউনলোড করুন